सत्याधीशसत्याधीश
SatyaDheesh
India's Ground Truth Record
Pull to refresh
VOL. I · EST. 11.2025 
SatyaDheesh
सत्याधीश
India's Ground Truth Record
LIVE

PM inaugurates Delhi-Dehradun expressway

GS3Economy · S&T · Environment · Security· Infrastructure (energy, ports, roads, railways)· Prelims·

Why in news

Prime Minister Narendra Modi inaugurated the ₹12,000-crore Delhi-Dehradun expressway to enhance regional connectivity and tourism.

Background

The project is a 213-km, six-lane corridor connecting Delhi and Dehradun through Uttar Pradesh. It includes wildlife corridors and is designed to integrate with major national corridors and pilgrimage centers.

Facts for Prelims

  • FactDelhi-Dehradun expressway project cost: ₹12,000 crore
  • FactLength of the Delhi-Dehradun expressway: 213 km
  • FactExpressway features: Six-lane corridor with integrated wildlife corridors
  • PlaceThe expressway connects Delhi to Dehradun via towns in Uttar Pradesh

For Mains

Q. Discuss how the expansion of high-speed expressways acts as a catalyst for regional economic integration and tourism development in the Himalayan states.

Dimensions to cover in your answer

  • Logistics efficiency: Reduction in travel time facilitating faster movement of goods and tourists
  • Ecological balance: Integration of wildlife corridors to mitigate habitat fragmentation by infrastructure
  • Tourism synergy: Improved accessibility to pilgrimage centers and mountain tourism hubs

Keywords: Regional connectivity · Infrastructure development · Logistics efficiency · Tourism promotion · Habitat fragmentation

Full chronology for revision →Read the full news →Report a mistake in this noteSource: The Hindu ↗Also: GS1 · Places in news / mapping

More Economy notes

All Economy current affairs →

Something wrong, or something missing?

Spotted a mistake in a note, or want a topic, format or PDF that would help your preparation? Write to us. We read every mail and fix errors fast.

Report a mistake →Ask for something →thesatyadheesh@gmail.com

This note is generated automatically from SatyaDheesh's news feed and mapped to the UPSC CSE syllabus. Check facts against the original report or PIB before using them in an answer.