Arunachal Pradesh State Cabinet approves panel for survey of Siang mega dam
Why in news: The Arunachal Pradesh State Cabinet approved an Empowered High-Level Committee to conduct a pre-feasibility survey for the Siang Upper Multipurpose Project (SUMP) despite local protests.
The Siang Upper Multipurpose Project (SUMP) aims to generate 11,000 MW of power and provide flood mitigation in the Siang-Brahmaputra basin. The project is intended to boost employment and socio-economic development in the region.
Prelims pointers (3)
- FactSUMP target capacity: 11,000 MW
- PlaceSiang-Brahmaputra basin: Location of the proposed project
- PostPema Khandu: Chief Minister of Arunachal Pradesh
Mains angle
Q. Discuss the trade-offs between large-scale hydroelectric projects and ecological preservation in ecologically sensitive zones like the Brahmaputra basin.
- Ecological risk: Potential impact on biodiversity and siltation patterns in the Brahmaputra river system
- Socio-economic friction: Balancing state-led infrastructure goals with local community rights and environmental concerns
Keywords: Pre-feasibility report · Hydroelectric power · Flood mitigation · Socio-economic development · Ecologically sensitive zones