सत्याधीशसत्याधीश
SatyaDheesh
India's Ground Truth Record
Pull to refresh
VOL. I · EST. 11.2025 
SatyaDheesh
सत्याधीश
India's Ground Truth Record
LIVE

Indian Railways nears 100% electrification: Only 269 Route Km left across 5 states

GS3Economy · S&T · Environment · Security· Infrastructure (energy, ports, roads, railways)· Prelims·

Why in news

The Ministry of Railways reported that Indian Railways has achieved 99.6% electrification of its Broad Gauge network as of May 31, 2026.

Background

Out of a total 70,271 route kilometres (RKm) of Broad Gauge lines, 70,002 RKm have been electrified. Only 269 RKm remain across five states: Rajasthan, Tamil Nadu, Assam, Karnataka, and Goa.

Facts for Prelims

  • FactIndian Railways achieved 99.6% electrification of its Broad Gauge network as of May 31, 2026.
  • FactTotal Broad Gauge (BG) network length is 70,271 route kilometres (RKm).
  • PlaceRajasthan, Tamil Nadu, Assam, Karnataka, and Goa are the five states with remaining non-electrified sections.
  • FactRajasthan has only 10 RKm of its 6,514 RKm BG network left to be electrified.
  • FactIndia's first electric train ran in 1925 on a 1,500-volt DC system between Bombay Victoria Terminus and Kurla Harbour.

For Mains

Q. Discuss how the near-complete electrification of the Indian Railways contributes to India's decarbonization goals and logistical efficiency.

Dimensions to cover in your answer

  • Decarbonization: Reduction in fossil fuel dependence and lowering of carbon intensity in the transport sector.
  • Operational Efficiency: Enhanced train speeds and reduced turnaround times through consistent power supply.
  • Energy Transition: Alignment with national goals for sustainable infrastructure and green energy adoption.

Keywords: Decarbonization · Logistics Efficiency · Sustainable Infrastructure · Broad Gauge · Energy Transition

Read the full news →Report a mistake in this noteHow notes are madeSource: Indian Express ↗

More Economy notes

All Economy current affairs →

Something wrong, or something missing?

Spotted a mistake in a note, or want a topic, format or PDF that would help your preparation? Write to us. We read every mail and fix errors fast.

Report a mistake →Ask for something →[email protected]

This note is generated automatically from SatyaDheesh's news feed and mapped to the UPSC CSE syllabus. Check facts against the original report or PIB before using them in an answer.