सत्याधीशसत्याधीश
SatyaDheesh
India's Ground Truth Record
Pull to refresh
VOL. I · EST. 11.2025 
SatyaDheesh
सत्याधीश
India's Ground Truth Record
LIVE

Sharavathi Hydroelectric Project: The cost of energy transition

GS3Economy · S&T · Environment · Security· Nuclear & new energy technology· Prelims + Mains·

Why in news

The Karnataka High Court ordered a halt to the Sharavathi Pumped Storage Hydroelectric Project following a challenge by environmentalists over its impact on the Sharavathi Lion-Tailed Macaque Wildlife Sanctuary.

Background

The Karnataka Power Corporation Limited (KPCL) aims to generate 2,000 MW of power through the project. The project is located within the Sharavathi Lion-Tailed Macaque Wildlife Sanctuary and faces criticism over cost escalation and lack of environmental clearances.

Facts for Prelims

  • PlaceSharavathi Lion-Tailed Macaque Wildlife Sanctuary: Location of the proposed hydroelectric project in Karnataka.
  • Fact2,000 MW: Target power generation capacity of the Sharavathi Pumped Storage Hydroelectric Project.
  • BodyKarnataka Power Corporation Limited (KPCL): The body responsible for the project's development.

For Mains

Q. Discuss the conflict between large-scale renewable energy infrastructure and biodiversity conservation in India's energy transition strategy.

Dimensions to cover in your answer

  • Ecological trade-off: Habitat fragmentation and threat to endangered Lion-Tailed Macaque populations
  • Regulatory bottleneck: Delays caused by lack of environmental clearances and cost escalation
  • Policy friction: Balancing state-led power generation targets with forest conservation mandates

Keywords: Energy Transition · Biodiversity Conservation · Pumped Storage Hydroelectric · Environmental Impact Assessment · Sustainable Development

Read the full news →Report a mistake in this noteSource: The Hindu ↗Also: GS3 · Biodiversity & conservation

More Science & Technology notes

All Science & Technology current affairs →

Something wrong, or something missing?

Spotted a mistake in a note, or want a topic, format or PDF that would help your preparation? Write to us. We read every mail and fix errors fast.

Report a mistake →Ask for something →thesatyadheesh@gmail.com

This note is generated automatically from SatyaDheesh's news feed and mapped to the UPSC CSE syllabus. Check facts against the original report or PIB before using them in an answer.