सत्याधीशसत्याधीश
SatyaDheesh
India's Ground Truth Record
Pull to refresh
VOL. I · EST. 11.2025 
SatyaDheesh
सत्याधीश
India's Ground Truth Record
LIVE

AP-Genco plans two 3,200 MW ultra mega thermal plants

GS3Economy · S&T · Environment · Security· Infrastructure (energy, ports, roads, railways)· Prelims·

Why in news

APGenco is planning two 3,200 MW ultra mega supercritical thermal power plants to stabilize the grid and provide base load power before retiring older units.

Background

Andhra Pradesh Power Generation Corporation Limited (APGenco) plans two ultra mega supercritical thermal power plants with a combined capacity of 6,400 MW. Potential partners for the project include Coal India Limited and Mahanadi Coalfields Limited.

Facts for Prelims

  • FactCombined capacity of the two planned ultra mega thermal plants is 6,400 MW.
  • FactIndividual capacity of each planned ultra mega supercritical thermal power plant is 3,200 MW.
  • BodyAPGenco: Andhra Pradesh Power Generation Corporation Limited.
  • BodyMahanadi Coalfields Limited: A potential partner in the power plant project.

For Mains

Q. Discuss the trade-offs between maintaining base load power stability and meeting environmental pollution norms in India's transition towards a cleaner energy mix.

Dimensions to cover in your answer

  • Grid stability: Ensuring constant power supply while phasing out high-emission thermal units
  • Policy friction: Balancing the 2030 retirement deadline for old plants with immediate pollution mitigation goals

Keywords: Base load power · Supercritical thermal power · Grid stability · Cost-benefit analysis · Decarbonization

Read the full news →Source: The Hindu ↗Also: GS3 · Nuclear & new energy technologyAlso: GS3 · Pollution (air, water, plastic)

More Economy notes

All Economy current affairs →

This note is generated automatically from SatyaDheesh's news feed and mapped to the UPSC CSE syllabus. Check facts against the original report or PIB before using them in an answer.