सत्याधीशसत्याधीश
SatyaDheesh
India's Ground Truth Record
Pull to refresh
VOL. I · EST. 11.2025 
SatyaDheesh
सत्याधीश
India's Ground Truth Record
LIVE

The Great Nicobar project

GS3Economy · S&T · Environment · Security· Infrastructure (energy, ports, roads, railways)· Prelims + Mains·

Why in news

The Indian government sanctioned a ₹72,000-crore 'Holistic Development of Great Nicobar Island' project to establish a transshipment and defense hub.

Background

The project involves an integrated city-state with an international Container Transshipment Terminal, a greenfield airport, and a township for over 3.5 lakh people. It is spearheaded by NITI Aayog and implemented by the Andaman and Nicobar Islands Integrated Development Corporation.

Facts for Prelims

  • FactProject cost: ₹72,000 crore
  • BodyNITI Aayog is the spearheading body for the project
  • BodyAndaman and Nicobar Islands Integrated Development Corporation is the implementing body
  • PlaceGreat Nicobar Island is located in the Andaman and Nicobar Islands
  • EnvironmentIndigenous tribes affected include the Shompen and Nicobarese

For Mains

Q. Discuss the conflict between large-scale infrastructure development and the preservation of indigenous rights and ecological integrity in ecologically sensitive zones.

Dimensions to cover in your answer

  • Ecological degradation: Potential loss of biodiversity and coral reef health in the Andaman Sea
  • Rights of indigenous peoples: Threat to the traditional way of life and land rights of Shompen and Nicobarese tribes
  • Procedural transparency: Allegations of procedural violations and lack of transparency in environmental clearance processes

Keywords: Ecologically sensitive zones · Indigenous rights · Transshipment hub · Sustainable development · Procedural transparency

Full chronology for revision →Read the full news →Report a mistake in this noteSource: The Hindu ↗Also: GS1 · Places in news / mapping

More Economy notes

All Economy current affairs →

Something wrong, or something missing?

Spotted a mistake in a note, or want a topic, format or PDF that would help your preparation? Write to us. We read every mail and fix errors fast.

Report a mistake →Ask for something →thesatyadheesh@gmail.com

This note is generated automatically from SatyaDheesh's news feed and mapped to the UPSC CSE syllabus. Check facts against the original report or PIB before using them in an answer.