सत्याधीशसत्याधीश
SatyaDheesh
India's Ground Truth Record
Pull to refresh
VOL. I · EST. 11.2025 
SatyaDheesh
सत्याधीश
India's Ground Truth Record
LIVE

Karnataka aims for 24 GW power capacity with ₹3 lakh crore investment

GS3Economy · S&T · Environment · Security· Animal husbandry, fisheries & allied· Prelims·

Energy infrastructure and industrial decentralization: a relevant GS3 topic on sustainable development.

Why in news

Chief Minister D.K. Shivakumar announced Karnataka's plan to reach 24 GW power capacity over five years through a ₹3 lakh crore investment to foster clean industrial growth.

Background

The Karnataka government aims for a 24 GW installed power capacity within a five-year timeframe. The initiative requires an investment exceeding ₹3 lakh crore and focuses on renewable energy and industrial expansion beyond Bengaluru.

Facts for Prelims

  • FactTarget power capacity: 24 GW
  • FactRequired investment: Exceeding ₹3 lakh crore
  • PlaceLocation: Karnataka

Prelims practice question

With reference to Karnataka's power capacity expansion plan, consider the following statements:

  1. The plan focuses exclusively on industrial expansion within Bengaluru.
  2. The initiative requires an investment of exactly ₹1 lakh crore.
  3. The state aims to achieve a power capacity of 24 GW within a five-year timeframe.

Which of the statements given above is/are correct?

  1. (a)1 only
  2. (b)3 only
  3. (c)2 and 3 only
  4. (d)1, 2 and 3
Show answer

Answer: (b) 3 only — Statement 3 is correct. Statement 1 is incorrect: The initiative focuses on industrial expansion beyond Bengaluru. Statement 2 is incorrect: The investment required exceeds ₹3 lakh crore.

For Mains

Q. Discuss the significance of expanding renewable energy infrastructure in decentralizing industrial growth and addressing regional imbalances in Indian states.

Dimensions to cover in your answer

  • Regional disparity: Addressing industrial concentration in urban hubs like Bengaluru
  • Energy transition: Balancing rapid industrial demand with renewable energy targets
  • Fiscal requirement: Mobilizing large-scale private and public investment for state-level infrastructure

Keywords: Renewable Energy · Industrial Hub · Regional Imbalance · Infrastructure Development · Clean Energy

Read the full news →Report a mistake in this noteHow notes are madeSource: The Hindu ↗Also: GS3 · Infrastructure (energy, ports, roads, railways)Also: GS2 · Government policies & schemes

More Agriculture notes

All Agriculture current affairs →

Something wrong, or something missing?

Spotted a mistake in a note, or want a topic, format or PDF that would help your preparation? Write to us. We read every mail and fix errors fast.

Report a mistake →Ask for something →[email protected]

This note is generated automatically from SatyaDheesh's news feed and mapped to the UPSC CSE syllabus. Check facts against the original report or PIB before using them in an answer.