Nitin Gadkari announces ₹993.64 crore project to upgrade NH10 against Teesta River landslides
GS3Economy · S&T · Environment · Security· Infrastructure (energy, ports, roads, railways)· Prelims·
Infrastructure resilience in ecologically sensitive zones: a GS3 and Disaster Management case study.
Why in news
Union Minister Nitin Gadkari announced a ₹993.64 crore project to upgrade NH10 from Rangpo to Ranipool to counter landslides and land sinking caused by the Teesta River.
Background
The project involves upgrading National Highway 10 into a two-lane highway with paved shoulders, tunnels, and viaducts. The initiative aims to mitigate frequent landslides and land sinking caused by the Teesta River.
Facts for Prelims
- FactProject cost: ₹993.64 crore
- PlaceNH10 route: Rangpo to Ranipool
- PlaceTeesta River: Source of landslides and land sinking in the region
- FactInfrastructure components: Two-lane highway, paved shoulders, tunnels, and viaducts
Prelims practice question
With reference to the NH10 upgrade project, consider the following statements:
- The project includes the construction of tunnels and viaducts as part of the infrastructure.
- The project involves upgrading the highway into a four-lane road with paved shoulders.
- The project is being implemented to counter landslides caused by the Ganga River.
Which of the statements given above is/are correct?
- (a)1 only
- (b)1 and 2 only
- (c)1 and 3 only
- (d)2 and 3 only
Show answer
Answer: (a) 1 only — Statement 1 is correct. Statement 2 is incorrect: The project involves upgrading the highway into a two-lane highway. Statement 3 is incorrect: The landslides are caused by the Teesta River.
For Mains
Q. Discuss the engineering and environmental challenges in developing resilient infrastructure in Himalayan regions prone to seismic activity and river-induced landslides.
Dimensions to cover in your answer
- Geological vulnerability: High risk of land sinking and landslides due to Himalayan tectonic activity
- Engineering trade-offs: Balancing tunnel/viaduct construction costs against long-term climate-resilient infrastructure needs
Keywords: Climate-resilient infrastructure · Geological hazards · Disaster-mitigation · Himalayan ecology · Logistics connectivity
More Economy notes
- Nomura cuts PB Fintech net profit estimates by 72% for FY28 after insurance reforms · 10 October 2026
- Karnataka Form 7 applications rise by 19,376 amid alleged bulk deletions · 10 October 2026
- Telangana to introduce 10 new generation policies for semiconductors and logistics · 9 October 2026
- Karnataka wins award for 9 GW highest under-construction wind power capacity · 9 October 2026
- DEA committee approves ₹5,000 crore KfW funding for Telangana-CRUTI sewerage project · 9 October 2026
- Tech job losses reach 253,000 as India's GCC ecosystem grows to 2,117 centers · 9 October 2026
This note is generated automatically from SatyaDheesh's news feed and mapped to the UPSC CSE syllabus. Check facts against the original report or PIB before using them in an answer.