सत्याधीशसत्याधीश
SatyaDheesh
India's Ground Truth Record
Pull to refresh
VOL. I · EST. 11.2025 
SatyaDheesh
सत्याधीश
India's Ground Truth Record
LIVE

In 2012, the Gujarat State Electricity Corporation and Sardar Sarovar Narmada Nigam

GS3Economy · S&T · Environment · Security· Nuclear & new energy technology· Prelims·

Why in news

The Gujarat State Electricity Corporation and Sardar Sarovar Narmada Nigam developed a canal-top solar plant to optimize land use and water conservation.

Background

The pilot project near Chandrasan village, Gujarat, spans 0.47 miles and reduces water evaporation by 2.38 million gallons annually. It aims to limit algae growth and has the potential to generate 2,200 MW of solar power if scaled to 10% of the state's canals.

Facts for Prelims

  • FactThe canal-top solar plant reduces water evaporation by 2.38 million gallons annually.
  • FactPotential solar power generation from 10% of Gujarat's canals is 2,200 MW.
  • S&TCanal-top solar plants are designed to limit algae growth and conserve land resources.

For Mains

Q. Discuss how canal-top solar projects can contribute to India's renewable energy targets while addressing challenges of water conservation and infrastructure maintenance.

Dimensions to cover in your answer

  • dual-use of infrastructure
  • water conservation benefits
  • maintenance and cost challenges
  • scalability for rural electrification

Keywords: renewable energy · resource optimization · water conservation · infrastructure synergy · decentralized power

Read the full news →Report a mistake in this noteSource: Times of India ↗

More Science & Technology notes

All Science & Technology current affairs →

Something wrong, or something missing?

Spotted a mistake in a note, or want a topic, format or PDF that would help your preparation? Write to us. We read every mail and fix errors fast.

Report a mistake →Ask for something →thesatyadheesh@gmail.com

This note is generated automatically from SatyaDheesh's news feed and mapped to the UPSC CSE syllabus. Check facts against the original report or PIB before using them in an answer.